Contract Title |
Smoke Abatement System (SAS) Demolition |
|
Location |
Center For Naval Engineering Learning Site, Naval Station, Pearl Harbor, Oahu, Hawaii |
|
Client |
Naval Air Warfare Center |
|
Contract # |
N61339-07-C-0122 |
|
Amount |
$400,000 |
|
Period |
12/07-05/08 |
|
Point of Contact |
Patrick Wong, 808-472-1435, patrick.wong@navy.mil |
|
NAIC Code |
238990, 562211 |
|
Scope of Work |
Provide supervision, management, equipment, materials, and trained personnel to clean and demolish JP-5 fuel system including storage tanks and pipeline; clean and demolish Deluge system, clean and backfill 500 feet of 4 feet diameter smoke transfer tunnel; and inert and demolish propane pipeline; abate asbestos and smoke stack insulation, cut and demolish the 60 feet tall and 13 feet diameter smoke stack; and recycle/dispose of the waste materials generated during the demolition. All demolition work is selective demolition without damaging surrounding structure and floor. |
|
|
|
|