Scope of Work |
Provide supervision, management, equipment, materials, and trained personnel to survey the hazmat, abate asbestos containing materials and lead paint, remove and dispose of residual material and sludge inside a 120,000-gallon hot settling tank, clean the tank and demolish thank tank, and pour concrete to bring the foundation to a flat area. All demolition work is selective demolition without damaging surrounding structure and floor. |